The purpose of this document is to summarize the end- to- end testing activities performed by QA team as part of AIOps Release 2.3
End to end functional and regression testing of AIOps is completed.
Period of Testing: 16th December 2021 to 27th December 2021
N/A
N/A
Module |
Limitations (Deferred Defects) |
AIOps PWF |
|
Rollback |
|
AIOps PWF |
# Of User Stories |
# Of Test Cases |
# Of Open Defects (Critical/High/Med/Low) |
||||||
Total |
Fully |
Partially |
Total |
Passed % |
Critical |
High |
Medium |
Low |
|
E2E Testing for 2.3 |
12 |
12 |
0 |
12 |
100% |
0 |
0 |
0 |
5 |
Regression |
|
|
|
309 |
100% |
|
|
|
|